Updated September 2026: in 2020, working from home for two days before a long vacation, my manager asked in the afternoon for several documents by the next day. Instead of building them from scratch, I checked my repository for existing material and finished quickly. I have rewritten it into a guide to building a personal repository that saves you under pressure.
I had permission to work from home for two days before my leave and hoped for quiet. At noon, nothing. Then my manager asked for multiple documents by the next day. I was angry, but I have a habit of checking my repository for similar past work first, and it let me complete the documents quickly.
What is a personal repository?
Your own organised collection of past work: decks, documents, diagrams, estimates and useful answers to common client questions. It complements any team repository, and it reflects the work you actually do.
How should you organise it?
- By topic, not by client or date.
- With clear file names describing the content.
- With a short index listing the most reusable pieces.
- Removing client names and confidential details from reusable versions.
What should you save after each piece of work?
The final version, plus the two or three slides or sections that were strongest. Five minutes at the end of each request builds a valuable library over a year.
How do you reuse without making work look generic?
Use past material as a starting point, then tailor names, context and specifics. Clients and reviewers notice copied content quickly, especially if another client's name slips through.
What about confidentiality?
Follow your company's rules on storing documents. Keep the repository on company-approved storage, and never reuse confidential client data in another proposal.
How do you keep it current?
Review it every few months. Replace outdated figures, remove material that no longer reflects your company's offerings, and mark the date each item was last checked. A repository full of stale content is almost as slow as having none.
How did it help before my leave?
It turned an evening of work into a couple of hours, leaving my last day for handover rather than drafting.
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.